NEW DOHA INTERNATIONAL AIRPORT - PACKAGE F

NUMBER 214
LOCATION Doha, Qatar
TYPE Industrial
VALUE QR 15,200,000.00
CLIENT Ministry of Municipal Affairs
Engineer ASCO Consultants
Status Completed

Brief description:

This project is an EPC Contract (Engineering, Procurement and Construction) and a Joint Venture between CDC and Motherwell Bridge for the New Doha International Airport- Package – F, the contract is for the construction of Fuel Tank Farm, Hydrant System, MEPD and all general external civil works.

  • The construction of a new Contractor designed Fuel Tank Farm with four No. Storage Tanks, Pumps, Fire Fighting System, distribution Pipe Work, 38 No. Hydrant Refuelling Points, Truck loading and unloading points (5 No) controls, Product recovery and Drainage Systems.
  • Contractor designed two (2) storey Control Room building, Administration building, Maintenance building, Substation, Pump Shelter, Canopy, and Site Lighting.
  • Engineer designed Roads, Hard-standings, Drainage, Electrical, Telephone, Sewerage and Site water and Fire fighting and all general external civil works.
  • Land scale work and irrigation